50kView Pages

Thursday, February 27, 2014

February 27 2014 U.S. PREPARE TO EVACUATE!!: Albuquerque Air Force Base ... CALSBAD DISASTER to UNFOLD - DOE Caught in Lies Regarding CARLSBAD PLUTONIUM Releases - Nuclear Fallout EMERGENCY Affecting HEALTH NOW!






Published on Feb 27, 2014
http://pissinontheroses.blogspot.com/...
(c)2014 www.POTRBLOG.com
DOE Caught Bending The Truth Again! Falsely Claims Release Material Was Predominately Americium.
DOE WIPP's latest "REASSURING" FALSEHOOD is that

"The release material was predominantly americium-241, material which is consistent with the waste disposed of at the WIPP. This is a radionuclide used in consumer smoke detectors and a contaminant in nuclear weapons manufacturing."

Of course this is not DOE's first FALSEHOOD about the WIPP site. For SIX days after the Plutonium Cloud was released on February 14th, DOE reassured people that there was no above ground radioactive release. DOE's tune changed 2 DAYS AFTER the POTRBLOG team posted our mathematical analysis, on February 18th, Our analysis was based on insider information that WIPP had detected MILLIONS of Radioactive Disintegrations Per Minute [DPM's]. Two days later on February 20th, DOE sheepishly admitted that they had indeed detected 4.4 Million DPM's


It seems today, once again, we are going to have to use math to make the DOE admit the truth again, namely that DOE's Radioactive Cloud contained 490% MORE PLUTONIUM THAN AMERICIUM.

The DOE desperately wants the word PLUTONIUM left out of the public's ears. DOE would prefer to have the public think the release was AMERICIUM. Hell can't nothin be bad that for somethin' named after America, especially when everybody keeps a little bit of the stuff in the smoke detector in their home. Its the updated version of the lie that inhaling Plutonium is like eating a Banana.

But don't take our word for it. DOE funds an radioactive monitoring organization which goes by the acronym CEMRC. Now CEMRC is no prize pig, we see obvious deception in their reports too. Things like making the release look smaller by averaging it out over the whole 7 days their measurement device was running, instead of just using the smaller 30 second period in which they claim the radioactive release occurred. Not only do we think that it is purposefully deceptive; we think improperly mixing units of measure speaks lowly of their Engineering Program.

DOE is running into the old problem of not being able to keep their web of deception from becoming tangled. DOE says the release MATERIAL was predominately Americium, where as the data released from CEMRC says that there was 490% more Plutonium than Americium in that radioactive cloud.. But that should not surprise anyone, WIPP was built to hold WEAPONS GRADE PLUTONIUM, the Americium is just a minor contaminate that grows as Plutonium 241 one starts to degrade over time. Finding Americium 241 is to Weapons Grade Plutonium 239 as mold is to a loaf of bread; its a minor blemish on the loaf but it really stands out. And, that is at the heart of the deception the DOE is using.

We show the math below based on CEMRC's latest numbers; take note that all the death and destruction came from 0.012 Grams of AIRBORNE DISPERSED radioactive material, then consider the site still contains TONS of Radioactive Material waiting for the next larger explosion.



*


Published on Feb 25, 2014
http://pissinontheroses.blogspot.com/...
(c)2014 www.POTRBLOG.com
PREPARE TO EVACUATE!!: Albuquerque Air Force Base Orders 1,200 Particulate Radiation Suits

On Feb 20th, Kirkland Air Force base in Albuquerque New Mexico awarded a sole source contract to MRI corp of El Paso, Texas for 1,200 Particulate Radiation suits. A obvious purpose for this order is to prepare for another massive Plutonium release from DOE's WIPP plant outside Carlsbad New Mexico.

" the contractor shall provide 1200 sets of personal protective equipment (PPE) single-use overgarments, hoods and footwear as indicated by size and part numbers below. Hoods and bootliners may be integrated into the suit design, but at a minimum must be designed to afford full protection to the wearer when worn as an ensemble. All part numbers used are Orex brand. Non-ventilated protective clothing shall protect the wearer against particulate radioactive contamination"
"300 each - Orex Ultra Coverall, Medium, Part Number: CSA3500-M
350 each - Orex Ultra Coverall, Large, Part Number CSA3500-L
300 each - Orex Ultra Coverall, Extra Large, Part number CSA3500-XL
150 each - Orex Ultra Coverall - Double X Large, Part Number CSA3500-XXL
100 each - Orex Ultra Coverall, Triple X Large, Part Number CSA3500-3X
1200 each - Orex Ultra Bootliners, XL, Part Number CS3516-XL
1200 each - Orex Ultra Hoods, Part Number CS3555"
As we stated in our previous post:
BUGOUT ALERT! CDC Preps MASSIVE Ventilator Order, References Radiological Event And Pandemic Influenza

One thing we know for sure, it would be wise risk mitigation to be able to IMMEDIATELY escape upwind of the WIPP site within a moments notice for anyone living within a 200 mile zone. This means having a P100 mask and items to sustain comfort immediately available and transportable (along with a plan to get out).

We expect that the DOE WIPP site should be tracking levels of Hydrogen, Methane, & VOC's from increased radiolysis occurring in the WIPP mine. But, this does not mean they will alert you. DOE denied the Plutonium release for DAYS.

Alternative media is just now reporting the size of the Plutonium release, we first quantified and reported the size of that Plutonium release over 1 week ago. People did not want to believe there was a massive release because ofNormalcy Bias, don't make that mistake again!


SOURCES available at
http://pissinontheroses.blogspot.com/...
*

An explosive bit of information was obtained by John Moore which he reveals on his February 25, 2014 show. He received this information from a private source about the Texas Department of Public Safety, which runs the Texas Rangers and the Texas Highway Patrol, telling their agents to keep all tactical and survival gear in their vehicles, with them, as of March 1, 2014 and to “be prepared” to possibly be on their own, to work independently after March 1st.

As Moore points out, the only reason they would be forced to work without any contact with headquarters is if there could BE no contact, meaning a possible EMP attack(?) (Mar thru May HMO alignment - Heavy Mass Space Object? or EVACUATION of downwind Texas  just EAST of Carlsbad New Mexico ?) shutting down communications. Officials believe they know something is coming, that is for sure..

This is revealed in the first few minutes of the show below.


No comments:

Post a Comment

Thanks, Your Comment will appear within the next 24 hours...

Your comment is very much appreciated and helpful to our readership.

.... Morpheus